Location | Bali – Indonesia |
Project | Elephant Safari Park |
Type | Lake Recirculation & ARB Plant |
Size | 1000 Visitor per day |
The ARB Plant was designed to accommodate 500 —1000 EP day. The client installed a Grass roof over the Bio Tower for visual aesthetics
Biosystems designed and installed a Biological Recirculation Bio-filter for the entire Elephant Park Pond system. We incorporated a Reed Bed wet land system to break down the BOD waste water from the Elephant wading pond.