WhatsApp Bio Systems Group

Text Only !

Specialists in Water and Waste Treatment

 Location Bali – Indonesia
 Project Elephant Safari Park
 Type  Lake Recirculation & ARB Plant
 Size  1000 Visitor per day

The ARB Plant was designed to accommodate 500 —1000 EP day. The client installed a Grass roof over the Bio Tower for visual aesthetics

Biosystems designed and installed a Biological Recirculation Bio-filter for the entire Elephant Park Pond system. We incorporated a Reed Bed wet land system to break down the BOD waste water from the Elephant wading pond.

Biosystemsgroup ©️ 2024 All rights reserved​.

Design by